Operations

Oklahoma:
Iron Horse System

The Iron Horse System serves producers working in the STACK/SCOOP/Merge play. The system will span Canadian, Grady, McClain, Stephens and Caddo counties and will consist of more than 150 miles of high- and low-pressure natural gas gathering pipeline by the end of 2018, multiple compressor stations and the Iron Horse Plant, a state-of-the-art cryogenic processing plant with the capacity to process 225 million cubic feet of natural gas per day (MMcf/d). Located in Grady County, the Iron Horse Plant site is designed to accommodate expansions that would bring total processing capacity to 625 MMcf/d.

Construction of the gathering system is underway, and Cardinal expects to commission the Iron Horse Plant in October 2018. 

Pennsylvania:
Cardinal NE System

Cardinal currently owns and operates a high-pressure, dry Utica gas pipeline system located in Tioga County, Pennsylvania. This pipeline system provides dehydration at the well pad and delivers gas directly to interstate pipeline markets. Our Tioga pipeline system is designed to accommodate centralized compression and dehydration facilities that will be added as production matures. The result is a pipeline system that was designed from day one to economically service the entire production life of each well pad.

Our pipeline system design concepts offer optimum long-term efficiency while providing our customers with the best opportunity for the greatest return on their investment.